Microsoft Visio Question - Techist - Tech Forum

Go Back   Techist - Tech Forum > Computer Software > Microsoft Windows and Software
Click Here to Login
Closed Thread
 
Thread Tools Display Modes
 
Old 05-17-2004, 10:38 PM   #1 (permalink)
Newb Techie
 
Join Date: May 2004
Posts: 2
Default Microsoft Visio Question

Hello everyone,

I want to create a Revision Level Field into a Visio document which basically has to increase by one, each time when the Modifie Date changes (I was able to insert the field for Modified Date - each modification in the document reflects on the Modified Date field).

Can anyone give me some help, please?

Thank you!

__________________

XL-5 is offline  
Old 05-18-2004, 08:59 AM   #2 (permalink)
Monster Techie
 
HoLoCroN's Avatar
 
Join Date: Mar 2004
Location: Plant City, FL
Posts: 1,305
Default

Here is a link to the Visio site with a list of different templates, one of those should help you out.
__________________

HoLoCroN is offline  
Old 05-19-2004, 02:20 PM   #3 (permalink)
Monster Techie
 
HoLoCroN's Avatar
 
Join Date: Mar 2004
Location: Plant City, FL
Posts: 1,305
Default

So, just so I can understand what you are trying to do, you want to automate the revision control of the document (Automatically adds a +1 to the revision number)



Lets say you have a document called Floor Plan.vsd at revision 1.0

Bob makes a few adjustments, you want the document to automatically update the revision to 1.1

A few days later, John adds a few charts to help simplify some of the layouts, so the level would automatically update to 1.2.


Is this what you would like to do?
HoLoCroN is offline  
Old 05-21-2004, 08:42 AM   #4 (permalink)
Newb Techie
 
Join Date: May 2004
Posts: 2
Default

Quote:
Originally posted by HoLoCroN
So, just so I can understand what you are trying to do, you want to automate the revision control of the document (Automatically adds a +1 to the revision number)



Lets say you have a document called Floor Plan.vsd at revision 1.0

Bob makes a few adjustments, you want the document to automatically update the revision to 1.1

A few days later, John adds a few charts to help simplify some of the layouts, so the level would automatically update to 1.2.


Is this what you would like to do?

yes, that is what i am trying to do.

do you know if there is a way to do that?
XL-5 is offline  
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off




Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -5. The time now is 05:58 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2017, vBulletin Solutions, Inc.