Change the order in which drive letters are assigned (Windows XP) - Techist - Tech Forum

Go Back   Techist - Tech Forum > Computer Software > Microsoft Windows and Software
Click Here to Login
Closed Thread
 
Thread Tools Display Modes
 
Old 10-15-2004, 01:40 AM   #1 (permalink)
Newb Techie
 
Join Date: Oct 2004
Posts: 22
Default Change the order in which drive letters are assigned (Windows XP)

How do you change the order in which drive letters are assigned in Windows XP. I can do it in earlier versions of Windows using config.sys, but apparently not in XP?????
__________________

__________________
VibrantLife is offline  
Old 10-15-2004, 08:21 AM   #2 (permalink)
It's all just 1s and 0s
 
office politics's Avatar
 
Join Date: Jan 2004
Location: in the lab
Posts: 6,555
Send a message via MSN to office politics
Default

im not sure about changing the order in which they are assigned. However, i know that you can change a drive letter in computer management's disk management componet.
__________________

office politics is offline  
Old 10-15-2004, 08:50 AM   #3 (permalink)
PowerQuest / Opera
 
TheMajor's Avatar
 
Join Date: Jun 2004
Location: Netherlands
Posts: 10,177
Default

The order depends on your partitions. Primary partitions get a driveletter first, starting at disk one. Then the logical partitions get a driveletter and then CD-ROM devices.

If u have 2 primary partitions and 2 logical the primary partitions will get C: and D: and the logical partitions get E: and F:

U can change the driveletters with Partition Magic if you are using Win98.
__________________
TheMajorMMX - Intel P200 MMX @ 225Mhz - V-Tech (PcPartner) Baby-AT mb w/ Intel Triton TX chipset - Nvidia Riva TNT2 M64 w/ 16MB - 256MB M-Tec SDRAM - Still running.....
TheMajor is offline  
Old 10-15-2004, 09:01 AM   #4 (permalink)
Master Techie
 
Join Date: Jul 2004
Posts: 2,932
Default

Go to Run, and type "diskmgmt.msc" without quotes.
__________________

-----------------------------------------------
Don\'t hate the player...Hate the game...
ShoobieRat is offline  
Old 10-15-2004, 09:25 AM   #5 (permalink)
Banned
 
Join Date: Oct 2004
Posts: 422
Default

you can change any drive or letter in comp management except c (i think you can't change c)
__________________
vance43211 is offline  
Old 10-18-2004, 10:04 AM   #6 (permalink)
Master Techie
 
Join Date: Jul 2004
Posts: 2,932
Default

You can change C, but in some versions of Windows, you MUST HAVE a C drive. You can't change your drives to be ABD, instead of ABC. If you change your C drive to another letter, you must change something else to C. The changes will most likely screw a lot of your apps up, though, and Windows may fail to boot.
__________________

__________________

-----------------------------------------------
Don\'t hate the player...Hate the game...
ShoobieRat is offline  
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off




Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -5. The time now is 01:21 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2018, vBulletin Solutions, Inc.