change order of boot question - Techist - Tech Forum

Go Back   Techist - Tech Forum > Computer Hardware > New Systems | Building and Buying
Click Here to Login
Closed Thread
 
Thread Tools Display Modes
 
Old 04-14-2006, 05:53 PM   #1 (permalink)
Ultra Techie
 
Join Date: Jan 2006
Posts: 781
Exclamation change order of boot question

aight i got my comp goin with new windows xp and everything working perfectly, and was wondering if i should leave the boot order at cd first then hd, or should i change it to hd first then cd drive?
__________________

__________________
Intel Q6600 w/ CM Geminii
MSI P6N Deluxe SLI
BFG 8800GT w/ 22'' Acer LCD
OCZ 2x2GB
WD 400GB SATA
Razer Barracuda AC-1, Razer eXactmat
Logitech G15, MX Revolution, X-230
Zalman Fatal1ty FC-ZE1 case w/ Zalman ZM-MFC1 Fan controller
R1C0CH3T is offline  
Old 04-14-2006, 06:38 PM   #2 (permalink)
True Techie
 
Join Date: Feb 2005
Posts: 160
Default

After you install windows you want it to boot from the hd first.
__________________
Gateway 506GR
CPU: Intel P4 Prescott 550 HT 3.4Ghz
MOBO: Intel D915GAG
RAM:1Gb (2x512) Samsung DDR400 PC3200 3,3,3,8
HDD: Seagate Barracuda 7200 RPM SATA 200GB
VGA: Diamond Stealth Radeon 9200SE
PSU: Thermaltake TR2 430W
Dan DeVille is offline  
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off




Copyright 2002- Social Knowledge, LLC All Rights Reserved.

All times are GMT -5. The time now is 02:33 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2018, vBulletin Solutions, Inc.