ShoobieRat
Fully Optimized
- Messages
- 2,932
Alright. I now have 50% of the new stuff for my new computer I'm building.
I just recieved my new mobo:
MSI K7N2 Delta2 Platinum
and my new processor:
AMD Athlon XP 3200+ 512kFSB Barton
All looks good (although I won't know till I get everything together if it all works as it should).
I put in my order for the third shipment, including
ADD-ON PPA USA|USB2.0/1394 (PCI USB/Firewire card)
(2) 120GB SEAGATE SATA
Thermaltake CPU FAN AMD|SILENTBOOST
PDP DDRAM 2x512MB 64x64 PC3200
The only thing left will be the eVGA Geforce 6800GT 256mb card, which I'm waiting for the next shipment to NewEgg to be delivered before I buy it.
Once I have that fourth order in...it'll be build time! w00t!
I just recieved my new mobo:
MSI K7N2 Delta2 Platinum
and my new processor:
AMD Athlon XP 3200+ 512kFSB Barton
All looks good (although I won't know till I get everything together if it all works as it should).
I put in my order for the third shipment, including
ADD-ON PPA USA|USB2.0/1394 (PCI USB/Firewire card)
(2) 120GB SEAGATE SATA
Thermaltake CPU FAN AMD|SILENTBOOST
PDP DDRAM 2x512MB 64x64 PC3200
The only thing left will be the eVGA Geforce 6800GT 256mb card, which I'm waiting for the next shipment to NewEgg to be delivered before I buy it.
Once I have that fourth order in...it'll be build time! w00t!